fredag 21. februar 2014

Deltic - Dinosaur or Died too Early?

I remember deltics well of course, even if i had a fleeting relationship to them in their BR service swansong when I was a nipper. Deltics weren't a locomotive you just saw and heard, you felt their power and prescence.

By the last old days of 1980 the deltic reign had ended. All be that ten years after the anticipated life time on  the ECML metals. Just as with the pacific steam locos the deltics replaced, they themselves were superceded . They had become dinosaurs.

Or had they? In reality the fleet got a stay of execution in 1978 and ploughed on with various east coast and the final rather ill suited liverpool - newcastle semi fast diagrams. Rationalised with two of their brethren becoming parts bins,  the rest in reality kept as an exhibition fleet into 1980.

The remarkable thing is that the remaining  locos have survived much longer in preservation: now more than half as long again as their active service wijth BR. The "third age" of the deltics with proffessional management and main line certification.

What then for the alternative history where BR or a private body supported their utility say another decade in service?

Well if privatisation had been happening in the 1970s then gyou can bet that they would have been. A private railway would not have invested in a hundred 56s and the entire class 58. Standardisation versus reliability was a BR mantra , the opposite has been seen across europe and the usa. So the brush type 4 and its under delivered promise and poor reliability would have stopped the later builds. Class 50s would have been sent back to by then GEC leaving deltics, peaks and the more reliable hydraulics to be the main 100mph service providers outside HST diagrams.

Another alterntaive future would have been re-engining.  By 1980 the Ruston Paxman Valenta would have been available in either a v8 at 1650bhp or a v16.  Twin v 12s could maybe fit in a deltic, giving them thus standard units to hst and an RA 6 not to mention 4000 bhp plus!

Maybe other improvements to lub oil and piston / crank systems in the deltic power unit could have made them less smokey and extended service interval to over 3000 hours. Or a turbo version tuned for efficiency.

Whatever the locos when compared to ageing 45s and dodgey engined 47s , deltics were only a tad more smokey and it was burnt oil not spewing diesel and lub. They werent the only relics of the rush to dieselise which were environmentally non PC even by the mid eighties.

Where would they have worked?

If there had been a gap for them to work in an extended lifetime, then it would have been in the west country that they would have thrived. Well into the 1980s there were enough north to south west diagrams with loco change from WCmL or the need for speed from Newcastle or York right through.

However there were also 50 class d400s and seemingly endless ETH peaks in the post oil-sloshing GWR. Not to mention duffs a plenty, one fails send out another until you are down to 47/3s and ice cold trains!

Deltics had higher ETH capacity than 50s and arguably better performance in the 85 to 110 mph range. However it was only the eastern depots, Paxman colchester and donnie works who had the expertise needed in the early 80s in order to keep an ageing fleet going.  Newcastle could then have been a centre for diagrams NE-SW with temporary stabling and driver training only at brum and bristol.

As a small, specialist fleet though there could be a case for remote allocation of servicing.

My own choice would be phasing out 50s over to HGR and including an upgrade to their eth. Thus allocating them to semi fast passengers, over night sleepers and speedlink on the ecml,. Then having 15 deltics allocated to Doncaster with a preserved demo fleet of four to newcstle and haymarket for railtours.

The donne main liners would actually work the west country with extensive drijver training for the wcml to Sw services during the day and the brum and newcastle sleepers at njight. This would be only to 1986 when boilered "bedz" were finally erradicated and enough hsts were released from ecml electrification to free up class 50 to take over any remaining GwR services in their new proven and fully rectified guise.

mandag 13. januar 2014

The APT: Britains Most Succesful of Failures

Back to another of my chestnuts - the APT - P in particular and a glance at the " E" for experimental predecessor.

The concept of tilting trains dates back some considerable time before even the APT- E (experimental, the single gas turbine version) made the light of day. 1970s technology was adequate for the APT-P , the prototype.

Only we didn't get a prototype, the first of it's type, we got six pre-production types, the class 370.

The crux of the matter lies in this very over ambition. Yes a gas turbine one off had been produced but it was a running laboratory using an already disfavoured power unit supply. Proof of concept was established. However what was needed was a single prototype of the APT-P and not a whole pre-production class.

Why not though, produce a further proof-of-commerciality if you like by having a viable class of APTs running actual passenger specials which reflected the belief in BR management that this was a faite accomplis, as before the HST and the Deltic and electrification had been. In the 1970s though and into the 1980s this arrogance would meet its match in an in patient, road-oriented Magaret Thatcher.

There are major issues with managing a project with six train sets: firstly you have a longer time for delivery and your overall budget is much bigger, despite being lower per unit than a single set. Secondly and most crucially, when you have something go wrong on one set which is serious, then you have to take all the other sets out of service (tests, PR visits and demonstration ADDEXs essentially) . Further to this you then have a very much larger burdon on resources and spare parts when you come to repair the problem or redesign the system.

The tilting system was somewhat problematic however all reports are that eventually this was solved to a level of reliability concordant with operational service. The braking system's design oversights would have been typical "punch list" items for the redesign between and APT- P single electric unit and any pre production run or actual production run (squadron)

Launching the train officially as an operational Faite Accomplis in a January was really just another example of project management not removing elements which could challenge the reliability of the project and its then key PR presentation.

This reflects on poor project management and too much power invested in decision making in BR in my opinion. Today if the railways were still public, or as with HST2 a public-private alliance,  then the project would be subject to tender and also to an expert committee and nost likely the "quantum leap" from the APT-E to the electrified prototype would be managed by a single unit or in fact competing designs.  Subsequently a fleet of pre-scale production models could have been established to introduce the trains such that the flagship services could be accelerated gradually and revenue returns on a 3 hour London-Glasgow, and shorter timings from Manchester, Liverpool and the West Midland towns on the WCML,  services be assessed.